Saudi Arabia - Labeling/Marking Requirements

                                               
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia price
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer

Construction Products Regulation – CE Marking | SGS Saudi Arabia

                                               
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia price
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer

Declaration of Performance and CE marking

                                               
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia price
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer

The Declaration of Performance: What is it and what is its

                                               
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia price
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer

Does Saudi Arabia mandate that a CE Mark for a Medical Device

                                               
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia price
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • Declaration of Performance (DoP) / CE Marking and Labeling Saudi Arabia manufacturer
  • What is a declaration of Performance (DoP) and a CE-marking?
  • 202118. 12. 2019 The procedures leading to a Declaration of Performance (DoP) and a CE-marking are described in Construction Product Regulation 305/2011 (CPR). The first precondition for starting the procedure is that the construction product in question falls under the scope of CPR.
  • What are the marking requirements for a product in Saudi Arabia?
  • Generally, if the product has an applicable Saudi-specific (SASO) standard or SASO-adopted standard, the marking requirements should be as per the SASO standard.
  • Can a manufacturer affix a CE marking?
  • No. According to Article 8 of the Construction Products Regulation, if the manufacturer does not draw up a Declaration of Performance for a covered construction product, it cannot affix the CE marking. Note that the provision of the CE marking is mandatory when a Declaration of Performance has been drafted.
  • How do you label a product in Saudi Arabia?
  • Labels must contain the product name, packer’s name, country of origin (COO) of manufacture or production, list of ingredients in descending order of predominance, instructions for the end use of the product (where applicable), and the shelf-life of the product. COO labeling is mandatory for imported and locally produced products in Saudi Arabia.
  • When should a manufacturer draw up a declaration of performance?
  • The manufacturer shall draw up a Declaration of Performance when a product covered by a harmonised standard (hEN) or a European Technical Assessment (ETA) is placed on the market. By drawing up this DoP, the manufacturer assumes the responsibility for the conformity of the construction product with the declared performance.
  • What is a declaration of performance?
  • It provides information on a construction product’s performance relative to its essential characteristics, such as those set by applicable standards. Manufacturers should issue the Declaration of Performance when their product is either covered by a harmonised standard or conforms to a European Technical Assessment.