New China-backed coal plants on EU’s borders could saddle
The plant is touted by politicians as a long-term solution to Bosnia’s energy supply issues. Construction costs of the plant will be covered mostly by a 613 million loan from China’s ExIm Bank, signed for in 2017. The majority of the construction will be carried out by China’s Gezhouba Group, with the smaller percentage going to local
China’s Climate Goals Hinge on a $440 Billion Nuclear Buildout
The world’s biggest emitter, China’s planning at least 150 new reactors in the next 15 years, more than the rest of the world has built in the past 35. The effort could cost as much as $440
Serbia forges ahead with China-backed coal power plant
April 6, 2025. A Serbian environmental NGO, the Renewables and Environmental Regulatory Institute (RERI), took legal action against the state-owned national electricity company EPS in January for exposing Serbians to toxic emissions from coal power plants. “Our thermal power plants are among Europe’s biggest emitters of sulphur dioxide.
Complete DOP Reactor Plant - China DOP Reactor and DOP Plant
China HS Code 8419899090 Production Capacity 50 Sets Product Description DOP Complete plant We can design, manufacture, install, commissioning and engineering complete DOP plant. The whole set of equipment includes reactor, vertical fractionating column, horizontal condenser, separator, receiver etc,
Explainer: What happened at China’s Taishan nuclear reactor?
SHANGHAI, June 15 (Reuters) - French energy company EDF (EDF.PA) is investigating a potential issue linked to a build-up of inert gases at its nuclear plant in China’s southeastern province...
- What is a Chinese energy project in Serbia?
- This project is the first large-scale energy project undertaken by a Chinese company in Serbia and a key practical cooperation project under the Belt and Road Initiative between China and Serbia in the energy sector.
- How patented plasticizer technology is used in DOP production?
- With our patented plasticizer technology, we build the most qualified and economic DOP (Di Octyl Phthalate) production plants. Through the advantages of our technology we have built 14 turn-key DOP plants in such a short time. The sum of the capacities of plans we built have reached to 350.000 tons/year. PATENTED DOP PRODUCTION PROCESS
- What is a turn-key DOP plant?
- Turn-Key DOP plant With our patented plasticizer technology, we build the most qualified and economic DOP (Di Octyl Phthalate) production plants. Through the advantages of our technology we have built 14 turn-key DOP plants in such a short time. The sum of the capacities of plans we built have reached to 350.000 tons/year.
- How many turn-key DOP plants have we built?
- Through the advantages of our technology we have built 14 turn-key DOP plants in such a short time. The sum of the capacities of plans we built have reached to 350.000 tons/year. PATENTED DOP PRODUCTION PROCESS Patent application for our production process was made in 13.05.2013.
- How many kilograms of water can be produced from a DOP plant?
- At the DOP facility, you can produce plasticizers such as DOP, DOA, DINP. 5- Waste from 1 ton DOP Production 46 kilograms of water will come out of the reaction. Turn-Key DOP PlantAdvantages of our Technology Reaction temperature is maksimum 215 C Reac...
- How many kilowatts a year will Serbia produce?
- The plant is expected to generate 2.5 billion kilowatt-hours of power annually, bringing Serbia's total installed capacity to over 16 percent of the country's national capacity.